Grade stakes let you choose the road surface before you start pushing dirt. The two most useful checks are where the road meets the surrounding ground and how much height it gains or loses along the way. Mark a short strip first, then inspect the grade before you commit the dozer.
Mark a corridor for the vehicle you need to move
Choose the ends of the route and mark the intended travel corridor with stakes. Use the on-screen placement prompt. Leave enough room for the intended vehicle to enter and exit without turning sharply into a bank. For a haul road, consider where you can keep the truck straight at the bottom of a ramp or before a crossing.
Work on one stretch first if you are learning the interface. Check that the marked line connects to ground you can already drive over before carrying the stakes farther.
Edit the heights to make a flat or sloped grade
In a recorded November demo run, the player aimed at a placed stake and tapped E to view and edit its grade, and held E to remove a stake. Use the prompts in your current build to verify those actions.
For a flat strip, set matching target heights at the points that should sit level. For a ramp, set a higher target at the uphill end and a lower one at the downhill end. Look at the approaches as well as the numbers. If either transition is abrupt, move the stake or change its height before cutting.
Read the marked squares before driving the blade into dirt
Walk along the grid and look for where the indicated slope falls away from the existing ground. A low area relative to your target will need fill. A high section will take a cut. The recorded player checked the angle using the squares before returning to the dozer. Compare both edges of the corridor to spot a twist or a sharp transition.
If the target calls for a large cut or fill that you cannot do in one pass, break the job into sections or choose a gentler line. Do not copy the stake heights from another map or route.
Follow the marked grade with the dozer
The Dirt Town Steam listing describes stake-based leveling with the dozer. Once you are happy with the marked surface, select the blade mode that follows the stakes and make a short test pass. Stop to compare the cut with the marked line before continuing. Use repeat passes or bring in fill where the existing surface is far from your target.
FAQ
Do I tap E to place a new stake?
The recorded player used E on a stake that was already placed. Check the placement prompt first, then aim at the placed stake to check or edit its height.
How do I fix a stake in the wrong place?
The demo player held E while targeting a stake to remove it. Verify your current prompt, remove the misplaced point, and check the marked corridor after replacing it.
How do I choose a grade for a ramp?
Set different elevations to connect the high and low ends of the route, then inspect the marked slope and the transitions into the surrounding ground.